Network transparency
As a transmission network operator, we provide transparent information about any ongoing measures and we comply with all publication obligations that arise in connection with operating a transmission system.
Network information
Check, if your construction project is located in the area of any of our or other pipelines.
Network information
Our high-pressure natural gas pipelines are located underground and well protected. However, they can be damaged by diggers. Construction companies, planning offices, and private home-builders are therefore legally required to seek information regarding any supply lines that are located within the area of their construction project. Such clarification is necessary to ensure that the pipelines are safe.The corresponding information about our network and those of many other infrastructure providers is available free of charge from BIL Leitungsauskunft.
Construction and maintenance work
We ensure safety and our pipe network is subject to continuous maintenance work. Our current measures are listed here.
Construction and maintenance work
To ensure that our pipe network is safe and to be able to guarantee uninterrupted energy supply, we continuously carry out service and maintenance work as well as smaller construction measures. Here is a list of our latest measures:Other transmission system operators’ maintenance work
According to § 28 paragraph 4 annex 1 CoA (Cooperation Agreement between the Operators of Gas Transmission Networks in Germany), we are required to inform you about any maintenance work performed by third-party transmission system operators that affects the use of the Nowega network. Information about construction and maintenance work carried out by:
Gas Network Development Plan
The basis for the development of natural gas infrastructure in Germany.
Gas Network Development Plan
The Gas Network Development Plan (NDP) forms the basis for the development of natural gas infrastructure in Germany. It provides that in the long-term future, transmission networks are always adjusted to the requirements at the time.The NDP is developed by all transmission network operators in Germany. The general public and market participants are involved in discussing the NDP, and it is approved by the Federal Network Agency (Bundesnetzagentur).
Further information and the latest drafts of the NDP are available from the website of the association of transmission system operators FNB Gas.
Publication obligations according to (EC) No 715/2009
Information about the network and services according to legal requirements.
moreInformation according to articles 29, 30 NC TAR
Documents concerning the current tariff periods
Information according to articles 29, 30 NC TAR
Tariff period 2026Standardised Information Sheet Art. 30 (date: 02.12.2025)
Simplified Calculation Model 2026 (date: 02.12.2025)
Standardised Information Sheet Art. 29 (date: 06.06.2025)
Price list for calendar year 2026 (date: 01.10.2025)
Tariff period 2025
Standardised Information Sheet Art. 30 (date: 14.01.2025)
Simplified Calculation Model 2025 (date: 02.12.2024)
Standardised Information Sheet Art. 29 (date: 14.01.2025)
Price list for calendar year 2025 (date: 01.09.2025)
Price list for calendar year 2025 (date: 01.07.2025)
Tariff period 2024
Standardised Information Sheet Art. 30 (date: 01.06.2024)
Standardised Information Sheet Art. 30 (date: 01.05.2024)
Standardised Information Sheet Art. 30 (valid until 30.04.2024)
Standardised Information Sheet Art. 29 (date: 01.06.2024)
Standardised Information Sheet Art. 29 (date: 01.05.2024)
Standardised Information Sheet Art. 29 (valid until 30.04.2024)
Simplified Calculation Model 2024 (date: 29.11.2023)
Price list for calendar year 2024 (date: 01.06.2024)
Price list for calendar year 2024 (date: 01.05.2024)
Price list for calendar year 2024 (valid until 30.04.2024)
Tariff period 2023
Standardised Information Sheet Art. 30 (date: 02.12.2022)
Standardised Information Sheet Art. 29 (date: 03.06.2022)
Simplified Calculation Model 2023 (date: 02.12.2022)
Price list for calendar year 2023 (date: 01.12.2023)
Tariff period 2022
Standardised Information Sheet Art. 30 (date: 02.12.2021)
Standardised Information Sheet Art. 29 (date: 07.06.2021)
Simplified Calculation Model 2022 (date: 02.12.2021)
Price list for calendar year 2022 (date: 06.04.2022)
REMIT notifications
Obligation to report inside information pursuant to the EU Regulation No 1227/2011.
REMIT notifications
An obligation to report inside information when it becomes available arises from the EU Regulation 1227/2011 (REMIT). In compliance with article 4 (1), we publish this information in English at entsog.eu.transparency database
You will find information on Nowega GmbH’s relevant points in our transparency database.
morecapacity booking platform
Information on the proceeds from the marketing of capacities
capacity booking platform
Information on the proceeds from the marketing of capacities by means of an auction on the capacity booking platformStandard Reports PRISMA Capacity platform
Short and Long Term Auctions
Dates of capacity auctions
Dates of capacity auctions
Dates of capacity auctions
Publication of the dates of capacity auctions on the capacity booking platform (§ 23c (5) S. 1 No. 2 EnWG“)Dates of capacity auctions
incremental capacity cycle 2025 - 2027
incremental capacity
incremental capacity cycle 2025 - 2027
incremental capacity cycle 2025 – 2027On 7 July 2025 the fifth cycle to identify incremental capacity to be created will begin. Until 1 September 2025, the transmission system operators will receive non-binding demand indications from participants requesting additional capacity at THE-cross-border points. If both the capacity requests and the fees to be paid in accordance with Article 26(11) of Regulation (EU) 2017/459 are received on time, the capacity requests are analyzed and the results published in market demand reports.
Important deadlines for the fifth incremental capacity cycle starting in 2025:
07.07.2025: Start of the period for non-binding demand indications and charging of the corresponding fees submitted by participants on time
01.09.2025: Deadline for non-binding demand indications by participants to be taken into account for the ongoing process
27.10.2025: Publication of reports on market demand analysis on the basis of non-binding demand indications received in good time during the ongoing process
20.01.2026: Publication of project proposals
05.05.2027: Publication of the offer levels for the annual auction
08.07.2027: Start of the annual auctions of the new capacities to be created, followed by an economic test (as necessary)