Network transparency
As a transmission network operator, we provide transparent information about any ongoing measures and we comply with all publication obligations that arise in connection with operating a transmission system.
Network information
Check, if your construction project is located in the area of any of our or other pipelines.
Network information
Our high-pressure natural gas pipelines are located underground and well protected. However, they can be damaged by diggers. Construction companies, planning offices, and private home-builders are therefore legally required to seek information regarding any supply lines that are located within the area of their construction project. Such clarification is necessary to ensure that the pipelines are safe.The corresponding information about our network and those of many other infrastructure providers is available free of charge from BIL Leitungsauskunft.
Construction and maintenance work
We ensure safety and our pipe network is subject to continuous maintenance work. Our current measures are listed here.
Construction and maintenance work
To ensure that our pipe network is safe and to be able to guarantee uninterrupted energy supply, we continuously carry out service and maintenance work as well as smaller construction measures. Here is a list of our latest measures:Other transmission system operators’ maintenance work
According to § 28 paragraph 4 annex 1 CoA (Cooperation Agreement between the Operators of Gas Transmission Networks in Germany), we are required to inform you about any maintenance work performed by third-party transmission system operators that affects the use of the Nowega network. Information about construction and maintenance work carried out by:
Gas Network Development Plan
The basis for the development of natural gas infrastructure in Germany.
Gas Network Development Plan
The Gas Network Development Plan (NDP) forms the basis for the development of natural gas infrastructure in Germany. It provides that in the long-term future, transmission networks are always adjusted to the requirements at the time.The NDP is developed by all transmission network operators in Germany. The general public and market participants are involved in discussing the NDP, and it is approved by the Federal Network Agency (Bundesnetzagentur).
Further information and the latest drafts of the NDP are available from the website of the association of transmission system operators FNB Gas.
Publication obligations according to (EC) No 715/2009
Information about the network and services according to legal requirements.
moreInformation according to articles 29, 30 NC TAR
Documents concerning the current tariff periods
Information according to articles 29, 30 NC TAR
Tariff period 2025Standardised Information Sheet Art. 29 (date: 25.09.2024)
Price list for calendar year 2025 (date: 25.09.2024)
Tariff period 2024
Standardised Information Sheet Art. 30 (date: 01.06.2024)
Standardised Information Sheet Art. 30 (date: 01.05.2024)
Standardised Information Sheet Art. 30 (valid until 30.04.2024)
Standardised Information Sheet Art. 29 (date: 01.06.2024)
Standardised Information Sheet Art. 29 (date: 01.05.2024)
Standardised Information Sheet Art. 29 (valid until 30.04.2024)
Simplified Calculation Model 2024 (date: 29.11.2023)
Price list for calendar year 2024 (date: 01.06.2024)
Price list for calendar year 2024 (date: 01.05.2024)
Price list for calendar year 2024 (valid until 30.04.2024)
Tariff period 2023
Standardised Information Sheet Art. 30 (date: 02.12.2022)
Standardised Information Sheet Art. 29 (date: 03.06.2022)
Simplified Calculation Model 2023 (date: 02.12.2022)
Price list for calendar year 2023 (date: 01.12.2023)
Tariff period 2022
Standardised Information Sheet Art. 30 (date: 02.12.2021)
Standardised Information Sheet Art. 29 (date: 07.06.2021)
Simplified Calculation Model 2022 (date: 02.12.2021)
Price list for calendar year 2022 (date: 06.04.2022)
Tariff period 2021
Standardised Information Sheet Art. 30 (date: 02.12.2020)
Standardised Information Sheet Art. 29 (date: 05.06.2020)
Simplified Calculation Model 2021 (date: 02.12.2020)
Price list for calendar year 2021 (date: 09.06.2021)
Price list for calendar year 2021 (date: 06.05.2020)
Tariff period 2020
Standardised Information Sheet Art. 30 (date: 02.12.2019)
Standardised Information Sheet Art. 29 (date: 09.05.2019)
Simplified Calculation Model 2020 (date: 02.12.2019)
Price list as of 01.01.2020
Tariff period 2019
Standardised Information Sheet Art. 30 (date: 28.11.2018)
Standardised Information Sheet Art. 29 (date: 26.11.2018)
Simplified Calculation Model 2019 (date: 01.12.2018)
Price list as of 01.01.2019
REMIT notifications
Obligation to report inside information pursuant to the EU Regulation No 1227/2011.
REMIT notifications
An obligation to report inside information when it becomes available arises from the EU Regulation 1227/2011 (REMIT). In compliance with article 4 (1), we publish this information in English at entsog.eu.transparency database
You will find information on Nowega GmbH’s relevant points in our transparency database.
morecapacity booking platform
Information on the proceeds from the marketing of capacities
capacity booking platform
Information on the proceeds from the marketing of capacities by means of an auction on the capacity booking platformStandard Reports PRISMA Capacity platform
Short and Long Term Auctions
Dates of capacity auctions
Dates of capacity auctions
Dates of capacity auctions
Publication of the dates of capacity auctions on the capacity booking platform (§ 23c (5) S. 1 No. 2 EnWG“)Dates of capacity auctions
incremental capacity cycle 2023 - 2025
incremental capacity
incremental capacity cycle 2023 - 2025
incremental capacity cycle 2023 – 2025
From the incremental capacity cycle 2023 – 2025 onwards, the German transmission system operators will charge a fee of €30,000 per market area border, type of request (incremental capacity or upgrade of existing capacity) and direction (entry or exit capacity) for their activities resulting from the submission of non-binding demand indications in accordance with Article 26 (11) of Regulation (EU) 2017/459 (NC CAM). Please note that the fee will also be charged if the transmission of the non-binding demand indication is not submitted to the applicants by the requesting party directly but by a third party (such as an adjacent, foreign TSO) (cf. point 37 BK9-22/042).
The approval by the Federal Network Agency and detailed information can be found in Decision BK9-22/042 or here.