Hier gehts zur Leitungsauskunft
Netznahe Dienstleistungen des Fernleitungsnetzbetreibers Nowega in Münster

Downloads

Documents that are relevant to our transport customers and other market participants as well as those that are required to be published can be downloaded here.

Network transparency

Standardised Information Sheet Art. 30 (2026) (date 02.12.2025)
Simplified Calculation Model 2026 (date: 02.12.2025)
Standardised Information Sheet Art. 29 (2026) (date 06.06.2025)
Standardised Information Sheet Art. 30 (2025) (date 14.01.2025)
Simplified Calculation Model 2025
Standardised Information Sheet Art. 29 (2025) (date 14.01.2025)
Standardised Information Sheet Art. 29 (2024) (date 01.06.2024)
Standardised Information Sheet Art. 29 (2024) (date 01.05.2024)
Standardised Information Sheet Art. 29 (2024) (valid until 30.04.2024)
Standardised Information Sheet Art. 30 (2024) (date 01.06.2024)
Standardised Information Sheet Art. 30 (2024) (date 01.05.2024)
Standardised Information Sheet Art. 30 (2024) (valid until 30.04.2024)
Simplified Calculation Model 2024
Standardised Information Sheet Art. 30 (2023)
Standardised Information Sheet Art. 29 (2023)
Simplified Calculation Model 2023
Standardised Information Sheet Art. 30 (2022)
Standardised Information Sheet Art. 29 (2022)
Simplified Calculation Model 2022

MeLo and MaLo IDs as of 15.07.2025 (German)

Structural features of Nowega GmbH (German)

Publication of 2026 internal order in accordance wirth Article 11 Item 9 CoA XIV.2
Publication of 2025 internal order in accordance with Article 11 Item 9 CoA XIV
Publication of 2024 internal order in accordance with Article 11 Item 9 CoA XIII
Publication of 2023 internal order in accordance with Article 11 Item 9 CoA XIII
Publication of 2022 internal order in accordance with Article 11 Item 9 CoA XII

Network access

Communication data sheet 2025 (as of 03.11.2025)

Network Access Conditions (date: 01.11.2015)
Supplementary Provisions to the Nowega Network Access Conditions (german, date: 01.01.2016)
Biogas Network Connection Request (german, date: 01.01.2026)
Network Connection Guidelines (german, date: 01.05.2024)
Metering point operator framework agreement (MSB) (german, date: 01.01.2024)
Service description MSB (german, date: 01.11.2024)

Other documents

General Terms of Purchase (german, as of 15.01.2024)

Data Privacy Policy for Candidates (german; as of 01.01.2021)
Data Privacy Policy (german; as of 01.01.2021)
Data Privacy Policy for Business Partners and Customers (german; as of 01.01.2021)
Data protection information sheet for video surveillance (german)

Information on maintenance measures (german)
Information on lines (german)
Information on route maintenance (german)

Safety data sheet (german, Erdgas getrocknet)

Contact

Getting here

Logos Nowega

Logo rgb